Assignment Detail

Tutors

What is the conversion premium on the bond

    Assignment Instructions

    Assignment ID: FG132920715

    Question – A convertible bond has a par value of $1,002, but its present share price is $951.8763. The current price of the issuing company’s stock is $19.8621, and the exchange ratio is 42.9632 shares. What is the conversion premium on the bond?

    (i) For creation coordinating:

    (A) Short term expecting is helpful

    (B) Medium term surveying is significant

    (C) Long term expecting is significant

    (D) Forecasting isn’t helpful.

    (ii) For creation coordinating:

    (A) Short term expecting is helpful

    (B) Medium term surveying is significant

    (C) Long term expecting is significant

    (D) Forecasting isn’t helpful.

    (iii) Scheduling shows:

    (A) Total cost of creation

    (B) Total material expense

    (C) Which asset ought to achieve which work and when

    (D) The smooth out of materials

    (iv) Linear Programming is a method utilized for picking:

    (A) Production Program

    (B) Plant Layout

    (C) Product Mix

    (D) Manufacturing Sequence.

    (v) The astonishing cutoff isn’t influenced by which of the going with parts:

    (A) Forecasts of interest

    (B) Plant and work sufficiency

    (C) Subcontracting

    (D) None of the recently referenced

    (vi) Key focuses in measure technique bars which of the going with:

    (A) Make or purchase choices

    (B) Capital power

    (C) Process flexibility

    (D) Packaging

    (vii) The framework of laborer responsibility, as another model in progress/practices the board is

    (A) SCM

    (B) Just-in-Time

    (C) Quality Circle

    (D) MRP

    (viii) Production engineering in the moderate degree of time is named as

    (A) Production coordinating.

    (B) Long range creation coordinating.

    (C) Scheduling.

    (D) Aggregate coordinating.

    (ix) Preventive upkeep is huge in diminishing

    (A) Inspection Cost

    (B) Cost of not exactly ideal substitution

    (C) Shutdown Cost

    (D) Set-up Cost of machine

    (x) Number of thing courses of action that can be fabricated in Job creation is:

    (A) Limited to a couple

    (B) Large courses of action of things

    (C) One as it were

    (D) None of the recently referenced.

    (xi) In general number of thing courses of action that can be made in Flow creation is:

    (A) One as it were

    (B) Ten to twenty courses of action

    (C) Large courses of action

    (D) Five as it were.

    Need fresh solution to this Assignment without plagiarism?? Get Quote Now

    Expert Answer

    Asked by: Anonymous
    Plagiarism Checked
    Answer Rating:
    4.6/5

    Plagiarism free Answer files are strictly restricted for download to the student who originally posted this question.

    Related Assignments

    //
    Our customer support team is here to answer your questions. You can send Assignments directly to support team.
    👋 Hi, how can I help?